Marsh:ENCO Sewage Treatment Plant 6-16PE

from £1,585.00

The Marsh Enco sewage treatment offers high performance at a highly competitive cost, suitable for cost-conscious projects.

Tested and approved to BSEN12566-3/A1:2009 all ENCO units provide treatment well within national consent requirements.

Ranging in size from 6 to 16PE and with a wide range of ancillaries, almost all site, consent and budget requirements can be met by units from the ENCO range.

Key Features:

  • Low-energy compressor - near silent compressor ensures minimal running, maintenance and servicing costs.

  • Compressor housing – internal or external options available - the compressor can be housed internally or externally with no difference in cost.
    External recommended to increase compressor life, and supplied as standard on 4PE, shallow and pumped outlet versions.

  • PVC pressure pipe/diffuser(s) - provides a protective conduit for the air diffuser line. Can be easily removed for maintenance and cleaning.

  • Securing mesh - retains media in aeration chamber during transportation and handling, and in the event of flooding.

  • Sludge return (32mm) - larger diameter sludge return prevents the possibility of blockages and improves system circulation. Provides higher effluent quality whilst balancing flow over a 24 hour period or periods of intermittent use.

  • Standard impermeable lid - improves strength and durability whilst blending into the surrounding environment.

  • Stabilising feet - prevents the tank from rolling and allows safe and steady transportation and installation.

  • Unique ‘keying-in’ lip - assists anchoring into granular or concrete surrounds.

  • Bio-media - high specification bio-media (310m3 per m2) and membrane diffusers ensure even circulation to eliminate ‘dead spots’. The bio-media is contained by a securing mesh to ensure no migration during handling or potential flooding.

  • Integral lifting eyes - for safe and secure handling onsite.

Operating Principle:

In addition to anaerobic digestion taking place in the primary settlement chamber the Ensign:Ultra unit allows the clarified water to pass into a second ‘aeration’ chamber where it is treated to remove the dissolved constituents. Here aerobic bacteria, supported by diffused air and mobile media, ensures full treatment is achieved before the treated effluent and ‘sloughed off’ bacteria flows to a final settlement chamber . The final effluent is then discharged to the drainage field or watercourse.

Size:

The Marsh Enco sewage treatment offers high performance at a highly competitive cost, suitable for cost-conscious projects.

Tested and approved to BSEN12566-3/A1:2009 all ENCO units provide treatment well within national consent requirements.

Ranging in size from 6 to 16PE and with a wide range of ancillaries, almost all site, consent and budget requirements can be met by units from the ENCO range.

Key Features:

  • Low-energy compressor - near silent compressor ensures minimal running, maintenance and servicing costs.

  • Compressor housing – internal or external options available - the compressor can be housed internally or externally with no difference in cost.
    External recommended to increase compressor life, and supplied as standard on 4PE, shallow and pumped outlet versions.

  • PVC pressure pipe/diffuser(s) - provides a protective conduit for the air diffuser line. Can be easily removed for maintenance and cleaning.

  • Securing mesh - retains media in aeration chamber during transportation and handling, and in the event of flooding.

  • Sludge return (32mm) - larger diameter sludge return prevents the possibility of blockages and improves system circulation. Provides higher effluent quality whilst balancing flow over a 24 hour period or periods of intermittent use.

  • Standard impermeable lid - improves strength and durability whilst blending into the surrounding environment.

  • Stabilising feet - prevents the tank from rolling and allows safe and steady transportation and installation.

  • Unique ‘keying-in’ lip - assists anchoring into granular or concrete surrounds.

  • Bio-media - high specification bio-media (310m3 per m2) and membrane diffusers ensure even circulation to eliminate ‘dead spots’. The bio-media is contained by a securing mesh to ensure no migration during handling or potential flooding.

  • Integral lifting eyes - for safe and secure handling onsite.

Operating Principle:

In addition to anaerobic digestion taking place in the primary settlement chamber the Ensign:Ultra unit allows the clarified water to pass into a second ‘aeration’ chamber where it is treated to remove the dissolved constituents. Here aerobic bacteria, supported by diffused air and mobile media, ensures full treatment is achieved before the treated effluent and ‘sloughed off’ bacteria flows to a final settlement chamber . The final effluent is then discharged to the drainage field or watercourse.


Product Specifications

Size: Enco 6

Length (mm): 2602

Width (+/-50mm): 1650

Height (+/-50mm): 1935

Inlet invert (+/-50 mm):550

Inlet dia (mm): 110

Outlet invert (mm): 625

Outlet dia (mm): 110

Size: Enco 8

Length (mm): 2602

Width (+/-50mm): 1650

Height (+/-50mm): 1935

Inlet invert (+/-50 mm):550

Inlet dia (mm): 110

Outlet invert (mm): 625

Outlet dia (mm): 110

Size: Enco 10

Length (mm): 2602

Width (+/-50mm): 1650

Height (+/-50mm): 1935

Inlet invert (+/-50 mm):550

Inlet dia (mm): 110

Outlet invert (mm): 625

Outlet dia (mm): 110

Size: Enco 12

Length (mm): 2860

Width (+/-50mm): 1912

Height (+/-50mm): 2139

Inlet invert (+/-50 mm):550

Inlet dia (mm): 110

Outlet invert (mm): 625

Outlet dia (mm): 110

Size: Enco 16

Length (mm): 2860

Width (+/-50mm): 1912

Height (+/-50mm): 2139

Inlet invert (+/-50 mm):720

Inlet dia (mm): 110

Outlet invert (mm): 800

Outlet dia (mm): 110

View and download the Marsh ENCO Sewage Treatment Plant Brochure

Download Brochure

Installation Manual

Delivery Info

Delivery included (charges may apply to areas of Scotland, Northern Ireland and Islands) please contact us if you have any concerns.

Offloading is the responsibility of the customer.