Drainage Survey @ The Hawthorns - Cost Saving!!!

Following an Home Owners Drainage Survey at the Hawthorns it was confirmed that surface / foul waste water segregated, septic tank at its correct working level all relevant pipework in situ. The discharge went to a watercourse , hence system NOT Environment Agency compliant, we completed a porosity test. Calculated the linear meterage of drainage field required.

A designated drainage field was installed / constructed within the paddock, in accordance with build control ( H2 ) regulations, using the existing septic tank, client happy that a new sewage package treatment plant was not required..

Building regulations documentation provided, porosity test calculation results supplied for records, site left clean and tidy

Paul and team completed within 3 days - excellent 👏 👏 👏

Previous
Previous

Compliance @ The Oranges - COMPLETED

Next
Next

Working with Lamont Estate Agents