CROFT LODGE - COMPLIANCE UPGRADE

Following discussions with Mr Appleby @ Croft Lodge regarding the septic tank serving the property, we noted the following issues ;-

  • Shared septic tank with adjoining property

  • Combined surface and foul drains

Based on information / discussions it was agreed that Croft Lodge would have its own sewage system ;

  • Marsh Ensign PE10IPS sewage treatment plant

  • Drainage segregated

  • Cheshire East building certification, electric part ‘ p ‘ certification - passed

The system complies with Environment Agency binding rules, no consent to discharge is require volume below 5 m3 / day

Looking for drainage survey or sewage system installation?

Call - 07771903612

Email - info@envirocareom.com

Read More
Alex Griffiths
COMPLIANCE @ THE COTTAGE - EXCHANGE DEADLINE!

We completed a homeowners drainage survey for Mr Warren @ The Cottage, the property is under offer, the solicitor requested confirmation that the waste water system complied with EA binding rules.

All site drainage was segregated, septic tank correct size operating at its correct working level, ‘ T ‘ pipes in situ, unfortunately the discharge went direct into the adjacent boundary watercourse  - NON COMPLIANT SYSTEM.

Unfortunately there is no available land to install a drainage field, sewage package treatment plant required, to be completed by 4th April 2025, in time to exchange contracts.

  • Marsh Ensign delivered, Saturday 28th March 2025, tank in position / concreted  / piped up 1700 hrs 1st April 2025, electric connection/ certification and Cheshire East building final inspection 2nd April, site reinstate ,skips removed, all completed Thursday 3rd April 2025, contract exchange 4th.

Good work by Dave and team, thanks for working the week end.

In need of drainage consultancy and working to a tight deadline?

Call 07771903612 and we can help.

Read More
Alex Griffiths
MARSH ENSIGN TREATMENT PLANTS

Following a number of inquires due to -


1. Rural properties requiring upgrade due to non compliance with the Environment Agency binding rules,
And
2. Price increase as from 1st April 2025, sewage plants ; drainage materials ; aggregates and skips.

We secured 3 installations, to be completed by Friday 25th April 2025. Three sewage package treatment plants delivered to our compound, to-be delivered direct to the property as required.

We will be holding stock of Marsh Ensign sewage package treatment plants from 1st May 2025

Phone or email with your requirements - competitive prices

CALL - 07771903612

EMAIL - info@envirocareom.com

Read More
Alex Griffiths
COMPLIANCE @ THE ORANGES - COMPLETED

Following a site visit / discussions at The Oranges Norley Cheshire it was noted that the current waste water system was not operating efficiently and required upgrading to comply with Environment Agency Binding Rules. Based on the size of the property a Marsh Ensign PE08 sewage package treatment plant was supplied and installed.

  • Building regulations completed - passed

  • Electric connection / certification  - part  ‘ p ‘

Dave and team on site Monday 17th March 2025, install completed 21st March 2025, site left clean and tidy.

SELLING YOUR PROPERTY, NEED SURVEY, SEWAGE TREATMENT PLANT INSTALLATION?

CALL - 07771 903612

EMAIL - info@envirocareom.com

Read More
Richard Griffiths
DRAINAGE SURVEY @ THE HAWTHORNS - cost saving !!!

Following an Home Owners Drainage Survey at the Hawthorns it was confirmed that surface / foul waste water segregated, septic tank at its correct working level all relevant pipework in situ. The discharge went to a watercourse , hence system NOT Environment Agency compliant, we completed a porosity test. Calculated the linear meterage of drainage field required.

A designated drainage field was installed / constructed within the paddock, in accordance with build control ( H2 ) regulations, using the existing septic tank, client happy that a new sewage package treatment plant was not required..

Building regulations documentation provided, porosity test calculation results supplied for records, site left clean and tidy

Paul and team completed within 3 days - excellent 👏 👏 👏

Read More
Richard Griffiths
WORKING WITH LAMONT ESTATE AGENTS. 😃 😃 😃

We are proud to be working with another established estate agent ;-

CHESHIRE LAMONT

following conversations with Bill Swinley, we can now offer the following services, ensuring your property sale meets all Environment Agency & solicitor information requirements ; -

  • Home owners drainage survey, ensuring binding rule compliance.

  • Waste water system upgrades - suppliers of all manufacturers units, direct to site. ; Klargester / Graff / Marsh Industries / Harlequin.

  • Waste water drainage installations

  • Drainage field installations including Porosity test as per building regulations H2

    TWO LOCAL BASED COMPANIES , OVER 40 YEARS EXPERTISE IN PROPERTY AND DRAINAGE SERVICES - quotations available, call 07771 903612 - no job two small, phone today for a chat

Read More
Richard Griffiths
WORKING IN PRESTON - COMPLIANCE INSTALLATION

We attended the Gables [ Preston area ],to confirm if the 4 bedroom properties septic tank complied with EA binding rules, a Home owners drainage survey was completed Wednesday 5th March 2025. Unfortunately the tank discharged into a stream located at the rear property boundary, no surface water entered the system

Marsh tank delivered 17th March direct to site, excavation completed / tank in position 18th, building control on site, passed, electric part ‘ p ‘ provided, all ground work reinstatement will be completed 21st March 2025, pm.

Paul’s team completed install on schedule, ready to start next job on 24th March - 👍👍👍

Read More
Richard Griffiths
HOME OWNERS DRAINAGE SURVEYS

Following inquires to upgrade septic tanks followingA property sale we can provide the required information your solicitor will require to proceed with the sale of the property ;

HOME OWNERS DRAINAGE SURVEY - providing the information required to ensure your sewage package treatment plant complies with the Environment Agency binding rules.

A PROPERTY WITH OFF MAINS DRAINAGE SHOULD NOT BE PURCHASED WITHOUT A

HOME OWNERS DRAINAGE SURVEY

Results will confirm compliance, providing desludge, CCTV survey, drainage plan

report ( deviations / blockages / fractures / internal fibre of existing septic tank )

Phone for a quotation / date to provide your Home owners compliance information

📞. 07771 903612. or email ; info@envirocareom.com today

Read More
Richard Griffiths
MR WORRAL @ Dove Cottage compliant 👌👌

Mr Wirral re Dove Cottage required a sewage treatment plant to upgrade his 50 year plus septic tank which was discharging into the adjacent Brook.Following a conversation on what to do, we agreed to install a Marsh Enco 2G sewage package treatment plant to rectify the problem. Mark and lads attended site on 24th February 2025, removed existing septic tank replaced with Enco unit, site left clean and tidy.

Mr Worral received all relevant documents, warranty / building regulations / electric certification / waste transfer note - very happy complement Mark efficiency and politeness - typical of all the lads !!

Read More
Richard Griffiths
NOOK BUNGALOW - compliant with binding rules.

Following an inquiry regarding a property sale, we were asked to provide a compliant foul drainage system, for two properties which shared a septic tank.

Following a site visit we provided a written report outlining the current system failings and a quotation to supply a new system for both properties.

The team arrived on site on Monday 17th February 2025, installed a Marsh Ensign 4 IPS sewage package treatment plant, installation completed on21st February, all documentation submitted to client , sale going ahead as planned early March

Team moving to Garstang to complete upgrade, via recommendation - looking good 👍

Read More
Richard Griffiths
WAKEFIELD BUNGALOW COMPLIES WITH E A BINDING RULES ✅ ✅ ✅

We were requested by S Rhead, who was selling her fathers property to divert roof water from the foul system and replace septic tank with a sewage package treatment plant.

We attended the property on 2nd February 2025, diverted roof water into attenuation crates sized In accordance with roof area served [ m2 ], installed a Marsh Ensign sewage package treatment plant, desludge and infilled original septic tank, left site on the 9th February 2025 clean and tidy.

Cheshire East building control / electric certification supplied, all warranty documentation provided, waste transfer documentation provide, property can now be sold fully compliant.

📞 phone for free site visit and quotation OR e mail your inquiry - info@envirocareom.com

Read More
Richard Griffiths
THE WILLOWS - INSTALLATION PRIOR TO PROPERTY SALE

Following a site visit to The Willows and discussions with the property owner who required a sewage package treatment plant, to be located within a traffic-able area. The property was currently sharing a septic tank with the adjacent property, the septic tank was located in the neighbours garden, hence the client requires their own unit on their own property,

The Marsh Ensign was installed within in a turning area, the unit was installed In accordance with building regulations, strapped onto a concrete base then surround with C25 semi dry concrete including mesh .

All foul drainage was connected, the discharge was connected to the existing outfall, building ‘ electric certification completed.

The property now meets the Environment Agency’s binding rules and can be sold.

Home Owners drainage surveys, sewage plant supplies, installations completed -

📞 07771 903612 for Home owners drainage survey, site visit and installation quotation

Read More
Richard Griffiths
BARN CONVERSION - ACCREDITED INSTALLER REQUESTED

Following a request from Marsh Industries Ltd to attend Humbleton Barn conversion in Derby to install a Marsh Ensign PE06IPS sewage package treatment plant, the property owner requested an accredited installer.

The foul system would serve a barn conversion then discharge into a dyke located on the boundary of the property. Following discussions with the Environment Agency and building control it was agreed to install a IPS unit, although the dyke was continually flowing we had to ensure no surface water entered the sewage plant in adverse weather conditions - pumped outlet set 300 below embankment / ground level, 4’ / 110 mm UPVC discharge pipe diverted downwards ensuring no embankment erosion, directing flow into water course when low flows.

Steve took lads to Derby on 27th January 2025, tank delivered, working with developers architect and building control, installation will be completed by 25th January 2025,

Thanks Neil for the recommendation 👍👍

Read More
Richard Griffiths
Compliance installation - Yew Tree Farm Congleton

Starting work at Yew Tree Farm Congleton, weather had been terrible , snow melting, rain - and we had a Marsh Ensign PE06IPS sewage treatment plant to install.

As week progressed weather improved, all underground drainage pipework installed, tank location excavated, concrete base, strap eyelets installed, tank positioned in place, strapped, surround to turrets with C25 semi dry concrete, imported reclaimed / recycled sand to reinstate to ground level, clay spoil removed off site. All drainage connections made , electric connected, Cheshire East building control certificated, site left clean and tide, unfortunately we went over 2 days, but as normal lads worked week-end ensuring we finished by 20th January 2025 as requested by client 👌

Read More
Richard Griffiths
Compliance installation 6th January 2025 in Warmingham Cheshire

Working in School Lane, Warmingham to ensure the Old Post Office foul drainage complies with the Environment Agency binding rules.

Property discharges into shared septic tank in 3rd party garden, property owner wanted their own compliant system. Weather conditions not good, frost / snow, working in clay helped the main excavation stay rigid, installed a Marsh Ensign PE06IPS sewage package treatment plant, connecting to a new outfall within the adjacent field, new foul inlet 4” / 110mm UPVC underground pipework / manholes installed In accordance with building control. Electric/ building regulation compliance ‘ certification provide to client.

Reinstated patio and lawn area as was required by client, leaving site on Friday 10th January 2025, moving to Congleton

Read More
Richard Griffiths
MARSH DELIVERY - 3 sewage plants to be installed by the 17th January 2025

As the Christmas period was upon us , we required sufficient tanks to complete installations up to week commencing 13th January 2025.

Manufactures closing for festive holidays, transport delivery companies unable to confirm delivery dates, so we requested 3 Marsh Ensign sewage package treatment plants be delivered to our installation sites on Monday 16th December 2024. Steve met driver at Yew Tree Farm Wybunbury @ 0800 hours to enable lads to start install, he then continued to The Old Post office, install 6th January 2025, finally Yew Tree Farm Congleton, install 13th January 2025.

Lads will then be of to Derby for install of a Marsh PE06IPS w/c 20th January 2025, new year looking good.

HAPPY NEW YEAR TO ALL

Read More
Richard Griffiths
No 1 Lowlands CH3 9DT - compliance ✔️✔️✔️

Browns Bank required a upgrade foul treatment plant to ensure the system complies with the Environment Agency binding rules, supplied a Marsh Ensign PE08 sewage package treatment plant

Standard installation, no problems, all documentation provided , client happy, ready to move to next job.

if we can assist with your sewage system compliance issue, please give us a call, site visit FOC - 📞. 07771 903612 or e mail your requirements to info@envirocareom.com

Read More
Richard Griffiths
COMPLIANCE - Mosswood House completed ✔️

Mosswood House, CW6 9SA septic tank unfortunately did NOT comply with the current Environment Agency binding rules.

Following a site visual visit to enable confirmation of drainage runs and sewage treatment plant PE requirements, hence a Marsh Ensign PE12 sewage package treatment plant would be required.

Weather a bit mixed but Steve and lads got the job done, excess spoil removed off site by grab wagon, septic tank desludged & infilled In accordance with building regulations, electric certification completed by Dan and certified, building control signed off - 👏👏👏👏

Read More