Property compliance @ Sandymere. - 🆗

Site investigation at Sandymere showed that the current septic tank discharged effluent to an adjacent watercourse, hence NON COMPLIANCE with the current Environment Agency binding rules.

All surface. / roof water went to designated soak aways.

We were instructed to install a Marsh Ensign PE10 sewage package treatment plant adjacent to the existing unit, connecting to the existing inlet pipework from the property.

Based on discussions with the building inspector we decided to install a seasonal drainage pipe discharge to the receiving watercourse. The reason being that the development was an 8 bedroom property with only 3 occupants, hence te reduced discharge volume would initially utilise the ground, prior to entering the watercourse when flow was at a minimum, the Environment Agency acknowledged the process. ✔️✔️✔️

Work started on Monday 29th April 2024, building inspection to be completed on 3rd May 2024, all required documentation to be supplied direct to the client.

>. Property adheres to the Environment Agency binding rules. <

Previous
Previous

Desludge & service quotations available⁉️

Next
Next

Natural resources Wales - ✔️✔️✔️