NOT JUST A BLOCKAGE !
Following a telephone call regarding blocked drains, we organised a site visit to HPWJ the foul drains to remove any blockages.. The property owner new they had a sewage package treatment plant, had never had it desludged or serviced for over 3 years, when we removed the cover the following was noted ;-
a) sewage plant full to brim.
b) blower not operating.
c) outfall manhole & pipework blocked.
We organise Envirocare (NW ) Ltd to attend site, desludged sewage treatment plant, HPWJ outfall pipework back to tank, then all foul drains around property HPWJ to tank, desludged again, sewage plant cleaned and emptied, waste transferred to registered disposal site with all relevant duty of care documentation.
Blower replaced, serviced / commissioned left fully operational.
Development placed on annual service / desludge contract.
On there way to site - Eco flow sewage systems
Ecoflow sewage treatment systems - phone for price and delivery direct to your site.
ON LINE - may not be the best route
Following discussions with our client, after numerous phone calls with the on line sewage treatment plant supplier we finally obtained a tank which would serve the properties. Client told that the tank delivered could not be returned / exchanged, wrong invert depth, not adequate in capacity for the development ( PE06 ). PE10 required to comply with binding rules.
Beware when ordering on line sewage treatment plants - ensure you have the required information regarding site requirements - not always the most effective way to buy !
IVY HOUSE - replacement septic tank / drainage field
Septic tank failed, drainage field blinded.
Investigation showed the brick constructed septic tank walls were porous, no ‘ T ‘ pipe on outlet, porosity test completed, results OK, linear meters drainage field calculated.
Desludged septic tank, excavated out concrete base to install a traditional 10 person Kingspan septic tank, concrete into position connecting to existing foul inlet pipework.
Constructed a 56 linear meter traditional drainage field, terram membrane, drainage gravel, 4” / 110 perforated UPVC pipework, cover with drainage gravel, close terram membrane and back fill with as dug spoil, relay turf.
Should be completed 4th May 2023.
SEWAGE TREATMENT PLANT TEST CERTIFICATION - Phosphate treatment
Following a request from Welsh Council building control with regard to test certification for a phosphate package sewage treatment plant,
We had discussions with the manufacturer, who supplied the appropriate documentation.
Hence if you need to install a unit to meet Natural Resources Wales permitting criteria please do not hesitate to contact our office, we will supply the correct / tested unit and provide site visit & installation question.
> Call Richard on 📞07771 903612 for assistance.
INSTALLATION ;- CROSSWAYS CHESHIRE
Crossways Cottage, CW10 9LS selling property, have had a surveyors drainage report completed, usual problems identified, septic tank discharges to a watercourse, surface water drains entering also entering system. Additional problem, discharge pipework goes across neighbours rear garden, access limited.
Site inspection showed, property owned a small grass paddock / play area, and a culvert / stream running along hedge boundary ✅
We provided a quote to install a Marsh Ensign PE06 sewage package treatment plant, installed a new 4” / 110 UPVC drain from the SVP, installed a 460 manhole for foul / surface segregation, outlet pipe / new manhole ( sampling / maintenance ) to watercourse.
Existing drainage taking surface water only, job done
building regulations ✔️, electric certification ✔️, manufacturers warranty✔️, EA compliance registration✔️.
> WORK COMPLETED - Friday 21st April 2023
ECOFLO - improving effluent discharge quality { compliance }
Ecoflow wastewater treatment system, solution incorporating highly reliable coconut husk fragrant based filtering media to improve waste water quality.
It can be added to an existing septic tank for secondary treatment to adhere to binding rules, or a WWTP for tertiary treatment.
Suitable for 4 - 200 people
FEATURES
Natural , renewable and compostable filter
No energy bills
Silent and odourless
Can accommodate fluctuating flows
# Cheshire stockists and accredited installers - 📞 Richard ; 07771 903612 or Matt 📞 07970 416256
For additional information, brochures and prices
KEEPERS COTTAGE - installation completed .
Mr Wallace @ keepers Cottage required a septic tank replacement to adhere to Environment Agency binding rules and sell his property. We completed an home owners drainage survey to confirm surface & foul drains segregated, all OK. ✔️
A site survey was completed to confirm invert depth of existing drainage, ensuring the sewage package treatment plant inverts were correct. A Marsh Ensign sewage package treatment plant installed and concreted into position due to site ground conditions. Septic tank , limed and infilled In accordance with current building regulations.
Manufactures warranty details, building regulations, electric certification, Environment Agency compliance registration e mail & service / desludge quotation for 2024 supplied to Mr Wallace in home owners installation pack.
Work completed on Friday 14th April 2023, skip removed off site, area left clean and tidy , client satisfied, thanking lads for their hard work in the adverse weather. 🌧️ 🌧️ 🌧️
SANDYMERE INSTALLATION - completed
Following a site survey and discussions with Rachel , property head gardener at Sandymere, having problems with Environment Agency binding compliance and drainage flow issues to the septic tank. A drainage survey confirmed discharge problems with and surface water contamination.
ACTION
To divert surface water to designated soak aways, install a Marsh Ensign IPS sewage package treatment plant to existing outfall, work completed Thursday 6th April 2023.
> Lads can have a well earned Easter break
Building regulations ✔️. Electric certification ✔️ Environment Agency registration ✔️
INSTALLATION OF SEWAGE SYSTEM SUPPLIED BY CLIENT - RBC system
Following a call from a member of the management committee at CH4 8DX barn conversions, we were asked if ;-
a) would we install a Klargester RBC sewage package treatment plant to existing property drainage.
b) an homeowner was a surveyor, he had calculated invert levels, drainage survey completed, all electrical
certification would be completed by clients own electrician, skips would be provided as required.
We attended site on 1st April 2023, completed all excavations, installed sewage treatment package plant on 3rd, should be off site Tuesday 4th April 2023, at which point electrician and ground workers will attend site.
# The installation was completed has requested, we accept no liability with regard to tank capacity, electrical
certification and EA compliance registration.
A RECOMMENDATION IS ALWAYS GOOD & APPRECIATED - thank you
Following the installation at High Trees, we were asked by the owner / developer of the adjacent new build five bedroom property if we could supply a sewage package treatment plant for the property.
We obtained information regarding the development, location of sewage treatment plant, discharge point, etc.
A levels check was completed, pumping head & distance to water course, at which point a sizing chart provided to the client for their consideration.
#. We provided a Marsh Ensign PE08IPS sewage treatment plant, with an 880 mm invert, developer to install.
ASK YOUR ESTATE AGENT FOR DETAILS
We are working with a number of Cheshire estate agents to assist their rural clients complying with the Environment Agency binding rules.
Problems with property sales are occurring when the sale as been agreed, solicitors instructed to complete property searches, which then highlight ENVIRONMENT AGENCY NON COMPLIANCE, ence sale put on hold until problem rectified.
Ask your estate agent to obtain a HOME OWNERS DRAINAGE SURVEY & REPORT, or call us on 📞 07771 903612
# FREE QUOTATION AVAILABLE. #
EMERGENCY - blocked drains
Panic ☎️ call - my toilets not working, septic tank overflowing, what shall I do ?
PLAN ;- # desludge septic tank ✔️ # complete drainage survey ✔️
The outlet drainage pipework was found to be in a wooded area, flow was restricted due to root infestation, all drainage runs cleared, system left operational.
Client happy, toilet working - all OK
MARSH INSTALLATION COMPLETED ✔️ - within clients timefram
Contacted by Mr & Mrs Watson, @ SK5 6NS, requesting an installation of Marsh Ensign sewage package treatment plant for a barn conversion.
The tank required installing prior to the completion of the development, due to,access problems when the double garage constructed, { access for track machines would be restricted }
The initial installation was to install, inlet manhole, sewage package treatment plant and outlet manhole, this would be constructed as an Environment Agency sampling point as it would also receive surface water prior to discharge to the watercourse.
All foul & surface water drainage would be installed by developers ground workers.
INSTALLATION COMPLETED, BUILDING REGULATION APPROVED, ELECTRIC CONNECTION CERTIFIED. -work completed Thursday 23rd March 2023.