
Latest News
View case studies, regulatory articles and our latest news.
Filter by Category
SECOND INSTALLATION @ PULFORD - a recommendation is nice THANK YOU 👍
Damson Cottage , Pulford, Chester contacted our office following the installation of a sewage package treatment plant at their neighbours property, requesting we provide an upgrade of their septic tank.
On site survey, verbal quotation, Marsh Ensign PE10IPS sewage package treatment plant in stock, track machine in neighbours garde, skip available on Saturday 15th July 2023,
We started installation on 15th July 2023, completed on Tuesday 18th July 2023,
All building regulations & electric certification completed and documents delivered to client
Registered system on the Environment Agency register ✔️✔️✔️✔️✔️✔️✔️
CONSTRUCTION SITE FOUL WASTE MANAGEMENT SERVICE
Building sites, demolition sites, we can know provide an effluent tank combined with a maintenance / desludge service to ensure your development complies with Environment Agency legislation & guidelines.
To provide an effluent tank to be positioned under your welfare port a cabin for the collection of foul waste, when unit full ( alarm ) waste will be transferred to a registered disposal site with all relevant duty of care documentation, to be retained in your compliance folder.
Effluent tanks can be purchased and delivered direct to site, OR rented with or without a maintenance - desludge schedule.
QUOTATIONS AVAILABLE ON REQUEST
📞 Simon on 01829 260687 ext 3 or Richard on 07771 903612
W/c 10th July 2023 - POPULAR COTTAGE INSTALLATION
Installation at Popular Cottage, Pulford , Chester completed today, Chester, Cheshire West building control passed building regulations, electric connection certificated,
Customer satisfied,, foul sewage system know complies with Environment Agency binding rules.
IF WE CAN ASSIST WITH YOUR UPGRADE / SEWAGE INSTALLATION PLEASE CONTACT - 07771 903612
FREE QUOTATION AVAILABLE
Bad installation -
The owner of Brook Cottage called requesting we attend the property and reinstate the Klargester Biotec sewage package treatment plant. The sewage package treatment plant came out of the ground following the combination of heavy rainfall and a desludge taking place, leaving the property without any foul waste water treatment.
The cause was due to the tank being installed within an embankment, approximately 2 meters from a water course ( non compliant with current building & environment agency legislation ), not surrounded with concrete or gravel ONLY soil backfill.
The sewage was NOT damaged, repositioned in accordance with current building regulations, surround with C25 semi dry concrete, final 300 back filled with as dug spoil and area re turfed
Site left clean / tidy and fully operational - 🤗🤗🤗
SEWAGE PLANT FAILURE - can we assist ?
A call from a worried property owner with regard to the condition of their sewage package treatment plant ! The unit was being desludged and it was observed that the internal baffle had failed, it was difficult to clarify the cause of the baffle failure.
Reasons could be, build up of sludge pressure causing the baffle to collapse, weakness within build of sewage plant, 3rd party damage.
The treatment plant will require replacing, the effluent quality will not meet Environment Agency discharge consent limits, 20 - 30 - 20 , advised to contact their insurance provider to check if covered on the property household insurance.
WORKING WITH INSURANCE PROVIDERS WE CAN ORGANISE / REPLACE YOUR DAMAGED PLANT - based on
insurance authorisation - contact Richard on - 📞. 07771 903612
NURSERY / GARDEN CENTRE - Rainwater harvesting system
Following a site visit and discussions with a local independent nursery / garden centre, we were asked to install a rain water harvesting tank to collect water from buildings & green houses
The unit chosen was a Harlequin rain water harvesting unit, which was installed adjacent to the nursery, for watering of plants within the greenhouses, modified to operate automatically on a timer system.
System installed and operating as required by client
>. Details on rainwater harvesting systemtems available ; 📞. 07771 903612 for quote or site visit
MATRIX PE06 sewage treatment plant installation. - WA16 8TH
Following a site visit to a 4 bedroom barn conversion @ WA16 8TH, the client had research waste water sewage package treatment plants on the internet and decided on a Matrix PE06 sewage package treatment plant,
As the 4 bedroom property was sold by a local estate agent and searches flagged that the existing septic tank did not comply with Environment Agency binding rules, an upgrade was required ASAP.
Matrix unit was ordered and delivered to site on Monday 26th July 2023, installation completed late evening on Wednesday 28th July, { 2100 hours }
Cheshire East building control passed, electric connection completed Thursday 29th July 2023 by 1100 hrs, certificated, all documentation with client to enable completion of sale w/c 3rd July 2023.
WPL DMS 2 DIAMOND sewage package treatment plant installation
Mr Wallace from Bollington,, Cheshire, SK10 4ED asked if we would install a WPL DMS2 sewage package treatment plant @his new build 3 bedroom property, he had purchased the plant direct from the manufacturer.
His architect had completed all the compliance checks, building regulations ensuring the foul system complied with the Environment Agency binding rules ✔️
The installation was started on Wednesday 21st June 2023 and was completed on Saturday 24th June 2023, connecting to the property foul waste inlet, discharging to a stream adjacent to the property boundary.
The work was checked, passed by a private building control firm based in Congleton, no Environment Agency permit was required volume below 2m3 / day to ground.
.>. Site left clean and tidy,
SERVICES PROVIDED regarding property drainage systems
Working with Estate Agents and solicitors to ensure that properties they sell meet the Environment Agency binding rules and building control [ H2 ] requirements
We offer a HOME OWNERS SURVEY & REPORT to ensure the purchaser of the development has all the required information with regard to the drainage system.
surveys start from ; £210.00 plus vat
WORKING FOR THE FUTURE. - call today
Following discussions with Matt Crawshaw, area sales manager for waste water treatment manufacturers Premier Tech, we can know provide a range of Environmentally efficient / friendly waste water treatment / recycling products.
#. Sewage treatment systems which do not require electric supplies.
#. Sewage treatment plants capable of reducing phosphate discharge concentrations.
#. Rain water harvesting systems
LOOKING AFTER THE ENVIRONMENT - call Richard on 📞. 07771 903612,
RAIN WATER HARVESTING - the way forward
We are continually asked if we can supply / install rain water harvesting systems ?
What are the benefits of rainwater harvesting ?
What can we use the recycled water for ?
WORKING WITH MATT CRAWSHAW from PREMIER TECH we can provide a range of rain water harvesting units and provide an installation service to meet your site requirements.
>. CALL RICHARD on 📞 07771 903612 for additional information and quotation.
UPGRADE & COMPLY
Following an inquiry from a local council housing association we were requested to provide a waste water system to ensure the development complied with Environment Agency binding rules.
A site visit was arranged and discussion with the housing association compliance manager ;-
ACTION
a) complete a drainage survey to confirm surface / foul drains are segregated ✔️
b) provide a quotation for a sewage package treatment plant In accordance with British Water Standards ✔️
c) complete costing to rectify system - waiting for tender documentation
Current site failings = septic tank discharging to watercourse / surface & foul waste streams combined.
BESPOKE OFF MAINS DRAINAGE SOLUTIONS- phone for assistance
Following discussion with Steve Letisea, a wealth of knowledge, we can know offer a range of bespoke sewage treatment plants for domestic & commercial developments.
If you require a specific waste water treatment plant for your off spec project, please give us a call and hopefully we can provide the solution.
📞. 07771 903612. 💻. Info@envirocareom.com
NOT JUST A BLOCKAGE !
Following a telephone call regarding blocked drains, we organised a site visit to HPWJ the foul drains to remove any blockages.. The property owner new they had a sewage package treatment plant, had never had it desludged or serviced for over 3 years, when we removed the cover the following was noted ;-
a) sewage plant full to brim.
b) blower not operating.
c) outfall manhole & pipework blocked.
We organise Envirocare (NW ) Ltd to attend site, desludged sewage treatment plant, HPWJ outfall pipework back to tank, then all foul drains around property HPWJ to tank, desludged again, sewage plant cleaned and emptied, waste transferred to registered disposal site with all relevant duty of care documentation.
Blower replaced, serviced / commissioned left fully operational.
Development placed on annual service / desludge contract.
On there way to site - Eco flow sewage systems
Ecoflow sewage treatment systems - phone for price and delivery direct to your site.
ON LINE - may not be the best route
Following discussions with our client, after numerous phone calls with the on line sewage treatment plant supplier we finally obtained a tank which would serve the properties. Client told that the tank delivered could not be returned / exchanged, wrong invert depth, not adequate in capacity for the development ( PE06 ). PE10 required to comply with binding rules.
Beware when ordering on line sewage treatment plants - ensure you have the required information regarding site requirements - not always the most effective way to buy !