2025. - IMPROVEMENTS AND SERVICES
2025 - we will be offering additional services and products to ensure we meet our clients waste water Environment agency binding ruleβs / compliance requirements
1/ offering the complete range of GRAFF waste water systems.
2/ providing waste water maintenance services [ desludge and service In accordance with the manufactures recommendations ]
3/ in conjunction with several Cheshire estate agents we will provide Home owners drainage surveys - to confirm compliance, for off mains drainage systems .
COMPLETE WASTE WATER WASTE SERVICES - call today -π. 07771 903612
Read More
CLIENT ; SELF COMPLIANCE INSTALLATION [ Mr Wilkinson ]
Following a telephone call from Mr R Wilkinson regarding if his property complied with the Environment Agency binding rules. We attended site to complete a visual inspection ;
4 bedroom property
Septic tank discharged into land drainage within the field.
2 down spouts entering grid, which then entered the foul water system
SEPTIC TANK DOES NOT COMPLY WITH ENVIRONMENT AGENCY BINDING RULES
Following a further chat, it was agreed the property would require a sewage package treatment plant, Mr Wilkinson confirmed he would install the system himself. Provided a Marsh Enco PE06IPS sewage package treatment plant direct to his property.
SEWAGE TANKS SUPPLIED FOR SELF INSTALLATION - installation schedule provide for your assistance if required ;π. 07771 903612. info@envirocareom.com
Read More
COMPLIANCE @. CALVELEY ARMS
What a day to start an installation !!!!!!, we attended the Calveley Arms to upgrade the existing foul waste water system, the 5 bedroom property enquired a sewage treatment plant, normal procedure ;- size unit , Chester Cheshire West building control, prepare site, excavate, spoil off site, tank concreted in position, electric certification, hope to be off site by Friday 22nd November 2024.
Steve, Dave & Tom ready for next job, starting 25th November 2024 - already booked in πππ
IF YOU REQUIRE A-PACKAGE TREATMENT PLANT / SEPTIC TANK / PUMPING
STATION PLEASE CALL π 07771 903612 FOR SITE VISIT & QUOTATION
Read More
HIGHFIELDS COTTAGE - compliance installation
Following a π call from Highfields Cottage, Blackhurst Farm Road requesting if we could supply and install a foul waste water system In accordance with Environment Agency binding rules. Unfortunately the client had been let down by another installer and required the work completing asap.
We visited the site on Tuesday 5th November 2024, discussed the work required, provided a quotation the following day ( 6th ), acceptance confirmed, quick chat with Neil at Marsh Industries, delivery date agreed, Monday 11th November 2024.
Steve will be on site to accept delivery and start installation.
Skips / desludge / Cheshire East building regulations visits sorted - all looks good πππ
# FAST EFFICIENT SERVICE PROVIDED - CALL TODAY π 07771 903612
Read More
SERVICE AND DESLUDGE QUOTES AVAILABLE
Following an inquiry from a local estate agent to assist with the repair of a sewage package treatment plant at one of their let properties
Unfortunately they had no idea of the type of sewage treatment plant, size, discharge location, hence we completed a site visit .
Klargester BB sewage package treatment plant, correct size for development βοΈ
On inspection it was noted that the drive belt was missing and the unit had not been serviced within the last 2 years β [ tank should be serviced annually]
Provided quotation to service / repair sewage treatment plant as per the manufactures recommendations
The sewage treatment plant had been desludged by a third party, no waste transfer documentation provided β [ documentation should be retained by client for a minimum of 3 years In accordance with Environment Agency guidelines ]
# if you require a desludge/ service off your sewage treatment plant call π 07771 903612 for a quotation
Read More
MR WILCOX COMPLIANCE VISIT -
We attend School House, Mobberley to confirm if the properties septic tan complied with the Environment Agency binding rules.
Unfortunately for Mr Wilcox the answer was NO, reasons =
septic tank too small for property
Discharged into a ditch / stream
Several grids connected to foul system
The property will require, either ;
a) septic tank and drainage field OR
b) replace with a package sewage treatment plant, sized In accordance with The Code of Practice
Mr Wilcox as requested a sewage treatment plant installation upgrade !!!
Read More
COMPLIANCE UPGRADE @ BURLAND COTTAGE
Marsh Ensign PE08 gravity discharge sewage package treatment plant delivered direct to Burland Cottage for upgrade β compliance.
Steve will have to segregate surface and foul drainage prior to installing the sewage treatment plant within the footprint of the existing septic tank.
Desludge, skips, concrete and building control sorted for next week, 4th November 2024, looking to be off site by 9th, - installations waiting to be completed prior to Christmas.
If you need a compliance / upgrade please do not hesitate to call for a free site visit and quotation π 07771 903613 or e mail your requirements to info@envirocareom.com
Read More
COMPLIANCE UPGRADE IN LOWER PEOVER .WA16 9AX
Starting a compliance installation at Lower Peover today, Thursday 31st October 2024 following delivery to site by Marsh Industries, Enco PE10 sewage package treatment plant
Lads had excavation ready to place tank into position , concrete delivered at 1200 hours, building inspector on site at 1400 hours, all OK
Electrician booked to attend 1000 hours 1st November 2024, hopefully can reinstate area by Monday evening, final building inspection booked for 1400 hours on 4th November 2024, then we are ready to move to Burland Nr Nantwich, hope weather stays good ππ
Read More
WORK IN PROGRESS - give us a call !!
Following discussions with a local organisation in the CW5 area we were asked to provide an upgrade of their foul waste water system. The original septic tank was damaged due to ingress of water , following a drainage survey it was confirmed that the discharge entered a water course in an adjacent field, the septic tank was also undersized for the development.
Information provided from the client indicated that a 75PE sewage plant would be required to service the development, following discussions with Neil Prescott, Marsh industries regional manager, we obtained a drawing, and we will be attending site on Thursday 31st October 2024 to clarify the tank is correct and provide a supply and installation cost.
If you require assistance with the sizing / supply / installation of a waste water system please do not hesitate to call me on π 07771 903612 or e mail your requirements and I will respond by return.
# Working with Neil we can provide detailed drawings, he can offer advice and complete a site visit
Read More
WORKING WITH DEVELOPER
Following contact by a developer in the SY14 area, asking if we can install a sewage package treatment plant that he had purchased direct. The unit was for a barn conversion - 4 properties, 2 Γ 3 bedroom & 2 Γ 4 bedroom. We confirmed that the sewage plant was sized correctly, a permit to ground would be required from the Environment Agency if the unit was going to a drainage field, if to a watercourse a consent would not be required, discharge less than 5m3 / day .
A budget installation cost was agreed, we will attend site to complete a trial dig to clarify ground type, tank will be delivered to site on Monday 28th October 2024, lads will be on site to start work early Monday.
IF WE CAN ASSIST WITH YOUR DRAINAGE INSTALLATION - PLEASE CALL π 07771 903612. or email info@envirocareom.com
Read More
SITE VISIT - compliance issues
Following a site visit in Buerton Cheshire we were asked if the property sewage system complied with Environment Agency binding rules.
The current tank could not be classed as a septic tank, no β T β pipes in position, large quantity of floating material on tank which discharges into a soak away !!!!
Unfortunately the property sale should complete next week { w/c 21st October 2024 ),
Our recommendations is to complete Home Owners drainage survey, upgrade system with ;
a) new septic tank and drainage field, or b) install sewage package treatment plant.
Waiting confirmation from client, very confused, awaiting costings !
IF YOU HAVE DRAINAGE ISSUES CALL TODAY, friendly staff, site visits, upgrades, Environment Agency binding rules compliance.
π 07771 903612 installing units in Cheshire for over 30 Years
Read More
WASTE WATER BROCHURE AVAILABLE - π
Brochure available, if you require our sewage package treatment plant and waste water equipment brochure please contact ;
E mail - info@envirocareom.com. or π. 07771 903612
Read More
COMPLIANCE INSTALLATION @ Crossing Cottage Staffordshire
Tuesday 15th October, Wes and team on site to install a Marsh Enco PE06IPS. external blower at Crossing Cottage Staffordshire.
Excavation completed today. /. concrete delivery tomorrow. / drainage connections, building control inspection booked, off site on the 18th October 2024. - job completed
The property now complies with the Environment Agency binding rules
INSTALLATIONS, SEWAGE PLANTS AND DRAINAGE REPAIRS -π. 07771 903612
Read More
BIOTEC RANGE OF TREATMENT PLANTS AVAILABLE
When looking for a sewage package treatment plant, we can supply a Kingspan Biotec Sewage treatment plant to serve your property off mains requirements
# contact π. 07771903612 for current prices.
Read More
SOAK AWAY / DRAINAGE FIELD issues
We attended site at the White House in Flintshire to determine if the current septic tank adhered to the current Natural Resources Wales bind rules.
the property is served by a conventional septic tank, which outfalls into the adjacent farm land.
the tank is of the correct size for the property and has a NRW permit as is required
the issue with the outlet drainage is that the ground is saturated, water table higher than drainage field - hence area water logged
options available to install a sewage treatment plant, which could go to a water course if available, the daily discharge volume would be 0.9 m3 / day.
ACTIONS
we have contacted NRW to obtain confirmation if the treatment plant can discharge into the local stream, will the unit require nutrient neutrality treatment ( nitrogen / phosphate treatment ), hopefully we should be able to progress the inquiry within 7 - 10 working days
Problems with your off mains drainage - call π 07771 903612 for assistance.
Read More
BUYING A WASTE WATER TREATMENT SYSTEM -phone today
When you require to install or upgrade the foul waste water treatment system serving your property you should ensure that you comply to all regulatory guidelines ;
Ensure you size the treatment plant in accordance with the Code of Practice, Flows and Loads - 4 sizing criteria
Check the treatment plant is kyte marked and meets British water standards
Check with the your local authority re building regulation compliance
Installations completed by an accredited installer
Does the discharge meet the Environment Agency discharge requirements, nutrient neutrality, SSSI requirements, permits & consent documentation
As an accredited installer we cover all of the above, we offer a range of sewage treatment plants delivered direct to your site, prices start from Β£1825.00 plus vat for a 4 bedroom property, call today for a quotation. π. 07771 903612. OR e mail info@envirocareom.com
Read More
ROPE FARM INSTALLATION COMPLETE
We attended Rope Farm to install a new sewage treatment plant to comply with the binding rules, the plant was delivered on Tuesday 1st October 2024., due to the location of the plant, following discussions with our area Marsh manager, Nigel Prescott we agreed to have the inlet of the unit at the side, plus a whisper blower unit.
Steve as usual sorted the Installation within the allocated time period to allow exchange of contracts to take place on Friday 4th October 2024, all required documentation provided, Daniel Burton ready to move in property. ππππ
Read More
INSTALL ON TARGET - compliance π
Todays delivery at Grassendale allowed the team to start the installation of the Enco PE06 sewage package treatment plant to serve the 4 bedroom property.
Based on weather conditions the sewage plant will be installed by Friday 10 th October 2024, all warranty, building regulations & electric certification to be submitted to client.
IF YOU. REQUIRE A SEWAGE TREATMENT UPGRADE COMPLETING, PLEASE CALL WE CAN STILL COMPLETE PRIOR TO CHRISTMAS - π 07771 903612 OR ,e mail info@envirocareom.com
Read More
SEPTIC TANK REPLACEMENT REQUIRED !
Brook Cottage, Tarporley, Cheshire requested a site visit to inspect the septic tank and confirm if it complied with Environment Agency binding rules ?
The tank was in need of major repairs, the discharge was to a land drain located within the adjacent farmers field, hence NON COMPLIANCE.
Following discussions with the property owner it was agreed to provide a quotation to upgrade the system with a sewage package treatment plant, to be located within the foot print of the original septic tank connecting to the existing inlet / outlet drainage.
NOVEMBER INSTALLATIONS LOOKING GOOD
Installation quotations available, call π 07771 903612 for FREE SITE VISIT
Read More